How to Apply for a Zoning-Construction Development Permit Process:

Zoning Verification Letter (ZVL):A Zoning Verification Letter (ZVL) is a written document from the Planning Department verifying the following:
- Property is located within the City of Gastonia Planning jurisdiction;
- The zoning designation of the property;
- Verification that a particular use is permitted within the property’s zoning district; and
- Zoning regulations if applicable to the property;
- Status of open zoning violation cases against the property. Please be advised that an inspection of the property or building will not be conducted as part of the Zoning.
Once all documents and payments are complete and submitted, your application will be processed as it is received. It may take up to 21 calendar days for a ZVL to be processed. Failure to provide all required documentation outlined above will result in a delay of processing of the request. If you have not received your letter after the 21st day, email planning@gastonianc.gov to check the status.
The ZVL does not verify compliance with development regulations, parking, or certify legal non-conforming status. The Zoning Office does not provide verification of building or fire code compliance. Our letters are specifically for zoning.
The submission of sample letters with desired format or content is not permitted. A ZVL does not provide legal opinions or advice. A ZVL does not authorize development activity.
To obtain Certificates of Occupancy for open or unresolved building code violations, contact the Building Services department at 704-866-6729 and press 3 or email codeenf@gastonianc.gov.
For information on any open or unresolved Fire Code violations, contact the City of Gastonia Fire Department at 704-866-6806 or 704-866-8607.
To obtain site plan information, contact Engineering & Land Development at 704-866-6943 or engineering@gastonianc.gov.
How to Apply for a Zoning Verification Letter: